Windchests
All windchests have their bottom boards gasketed and installed and we are now working on the topboards of the chests. The swell chest is complete and ready to have the holes drilled for the pipes. Work is progressing on the great chest and offset chests. Pictured is the main great chest with topboards installed and the Trompette chest with topboard. The topboards have not been drilled for the pipes yet.